Thank you for your patience. Some pages may be slower than usual while we make improvements behind the scenes.

Tuesday 21 July 2026
Beta
The Daily Geelong

Geelong Local News · Every Day

policy

Geelong secures funding to link Norlane residents with Ford precinct jobs.

The policy channels funds into road and training projects that connect Norlane residents directly to new positions in the former Ford precinct and surrounding industrial zones.

By Geelong Policy Desk · Published 20 July 2026

How we reported this

Produced with AI assistance and reviewed against our editorial standards. Sources are linked where available. Spotted an error or need a correction? Contact [email protected].

Geelong secures funding to link Norlane residents with Ford precinct jobs.
Photo: Maya-Anaïs Yataghène from Paris, France / Wikimedia Commons (CC BY 2.0)

The updated Geelong City Deal, detailed in the Victorian government's 2026 budget papers, directs 85 million dollars toward road upgrades and skills programs at the former Ford manufacturing site in Norlane and the adjacent North Geelong industrial area.

This funding round arrives as candidates contesting the state seats of Geelong and Lara prepare for the next election, with local platforms now centering on transport links and workforce entry points rather than broader state-wide themes.

Effects on Daily Commutes and Job Access

Residents in Norlane and Corio who travel daily to industrial sites will use the planned North Geelong bypass extension, scheduled to open in 2028 under Department of Transport timelines, cutting current peak-hour delays on the Princes Highway by up to 15 minutes each way. Training places at Deakin University will expand by 1500 certificates per year in advanced manufacturing, giving school leavers in Lara and Whittington a direct pathway into roles at the revived precinct without relocating to Melbourne.

Policy analysts say the allocations also cover service upgrades at the Geelong Railway Station interchange, allowing workers from Surf Coast towns to reach the Ford site area on existing V/Line timetables rather than relying on private vehicles.

Budget Figures and Timeline

The Productivity Commission has found that earlier regional city deals produced a 12 per cent increase in manufacturing employment within three years in similar locations, and the current Geelong figure of 85 million dollars appears under the infrastructure line item in the 2026 budget papers. Tender documents for the first stage of road works are due for release in September 2026, with contract awards expected before December.

Candidate briefings scheduled for August at the Geelong Performing Arts Centre will outline how each contender intends to monitor delivery against these dates, giving voters in the affected suburbs a concrete timetable to assess progress before polling day.

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

The Daily Geelong is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.

The Daily Network · local news across AUS